PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed rebar along the block layout at the 1st floor cells Facing North.jpg Installed waste piping at the 1st floor going into the 2nd floor Kitchen 213.jpg Installing sanitary-waster piping at the 1st floor going into the 2nd floor bathroom 208 Facing North.jpg Sanitary-waste piping going into the 2nd floor bathroom 234 Facing North.jpg Started laying out block at the detention cells Facing South-East.jpg Bathroom 220 roughing Facing North-West.jpg Bathroom 234 Roughing Facing West.jpg Continued installing ductwork at the 3rd floor Facing East.jpg Hot water supply - return piping at the 4th floor Facing West.jpg
Previous pageNext page Started laying out block at the detention cells Facing South-East
Started laying out block at the detention cells Facing South-East